Salim Amir

Senior Architectural and BIM Technician

BA Arch, Dip. Arch, ACIAT

As Senior Architectural & BIM Specialist at HTA, Salim is currently engaged with Stonebridge 29/30, where he is preparing and issuing of deliverables for RIBA Stages 3-6. Liaising and coordinating with principle and sub-contractors as well as the creation and maintenance of 2D & 3D assets for project deployment and practice standards as well as contributing towards BIM development across multiple teams.

Previous to HTA, Salim worked at Pilbrow & Partners (2014-2016) as a BIM Co-ordinator, which involved being responsible for authoring the BIM protocols, execution plan and guidance for level 2. He implemented a training program for staff and devised a bi-directional workflow between Autodesk AutoCAD - Bentley MicroStation and Revit. As a BIM Technician in this role, he prepared and issued the deliverables for RIBA Stages 3-6 and COBie. He liaised and coordinated with principle and sub-contractors as well as the creating and maintaining 2D & 3D assets for project deployment and practice standards.

From 2013 to 2014, Salim worked at Broadway Malyan, again acting as a BIM Technician where he prepared and issued information for RIBA Stages 3-5 as well as the creation of 2D and 3D assets for project deployment.

 

Prior to this, he worked at Paul UK, where he was a designer and technologist assisting with building surveys, feasibility studies, design development, 2D and 3D asset creation, renders, CAD drawings, editorial design and planning. He also worked on digital prototyping of 2D and 3D assets for product and packaging including renders and technical drawings to validate physical mock-ups and for manufacturing.

For the longest period, Salim worked at EPR Architects Ltd (2003-2009) as a RIBA Part I & II Architectural Assistant assisting with concept designs, feasibility studies, design development, 2D and 3D asset creation, renders, animation, video editing, CAD drawings, editorial design and planning.

At HTA, Salim is currently working on Stonebridge 27 and 29/30, where he is preparing and issuing of deliverables for RIBA Stages 3-6 and COBie. Liaising and coordinating with principle and sub-contractors as well as the creation and maintenance of 2D & 3D assets for project deployment and practice standards as well as contributing towards BIM development across multiple teams.