Grand Felda, Wembley

The development consists of 22,360sqm of mixed-use in 2 blocks over a podium and basement, one block is 18 storeys and the other 9 storeys with a large courtyard amenity space between, comprising 802 student residential units, extensive student communal facilities, a publicly accessible leisure centre including extensive gym facilities and a 25m regulation swimming pool, and associated ancillary spaces and plant. The building is clad in a number of materials including brick slip, aluminium cladding, render and GRC, and the external areas are well landscaped, including planting, growing ground cover, brick and stone paving, seating and amenities, and extensive green roof finishes.

All rooms were constructed using a steel framed modular system which enables a quick off site manufacturing method, delivered and installed to site efficiently. The development was completed within a 12 month construction period.

Grand Felda is one of the many projects HTA has worked on along with Donban Construction. Other projects include; Olympic Way, Karma House and Apex House which have all been built using the same construction methods. The scheme provides communal amenity spaces, swimming pool, gym, concierge and multiple retail opportunities at ground floor.

Location: Wembley, London

Client: Donban Construction

Accommodation: 802 student accommodation rooms

Start Date: 2014

Completion Date: 2016

Services Provided

Residential, Tall buildings