
The development seeks to maximise density on a well located site close to Cambridge railway station. A concrete basement with a podium above houses car parking and cycle storage. The accommodation above podium level is in simple blocks of timber frame construction with brickwork and board cladding. Balconies are in free-standing steel frame with timber cladding to the frame and provided with sliding louvred shutters for solar shading.
Location:
Cambridge
Client:
Taylor Wimpey (formally Laing Homes North)
Accommodation:
183 new homes
Tenure:
183 flat units comprising of mix tenure of which 43 are affordabl
Completion Date:
2008