Project
Dexion House
Location
Wembley, Brent
Client
Tide
Accommodation
802 student accommodation rooms
Planning authority
London Borough of Brent
Started
2015
Completed
2017

The development consists of 22,360sqm of mixed-use in 2 blocks over a podium and basement, one block is 18 storeys and the other 9 storeys with a large courtyard amenity space between, comprising 802 student residential units, extensive student communal facilities, a publicly accessible leisure centre including extensive gym facilities and a 25m regulation swimming pool, and associated ancillary spaces and plant. The building is clad in a number of materials including brick slip, aluminium cladding, render and GRC, and the external areas are well landscaped, including planting, growing ground cover, brick and stone paving, seating and amenities, and extensive green roof finishes.


All rooms were constructed using a steel framed modular system which enables a quick off site manufacturing method, delivered and installed to site efficiently. The development was completed within a 12 month construction period.


We have previously worked with Donban at both Olympic Way and Karma House (both in Wembley), using the sme construction methods. Also within the development, a swimming pool, gym and multi use room, concierge and multiple retail opportunities at ground floor.


We use cookies to personalize content and to analyze our traffic.
Top